8-foot Vertical Manway
Pictured here is an eight-foot full vertical manway that BMG Engineering designed, engineered and fabricated for Vale's Coleman Mine in 2012. Work included the complete galvanized manway and lowering system. All work and installation was performed from the top of the raise bore for the ultimate in safety. BMG Engineering also provided all the logistics necessary to simplify and expedite the installation.
Call us with all the requirements for your next project or expansion.